>RUN bios.EVA_reload
EVA requiring OS integration and reboot. Standby for suggestions.
a. Type 'reboot /all'
b. Reboot manually
>REBOOT /ALL
Complete system reboot. Accept? Y/N
Y
Waiting...
Establishing Electronic Video Agent, standby.
... ...... ........
EVA Online, establishing advanced system protocols
============EVA============
Welcome to Electronic Video Agent system offered by CNC Inc.
%EVA%/System/ -RUN
%EVA%/Config/Settings.cfg -RUN
%EVA%/Protocols/GSP_A -RUN
%EVA%/Protocols/ASP -RUN
%EVA%/Protocols/MAP -LOAD -SETNAME "MAP"
Main system protocols established
Standby...
Input orders...
>INPUT TOWN
Requesting UCID
>3
User Content registered. Input spike location...
>DIR SELECT
Standby for specified directions...
>SELECT MAP
Town Creator Map loaded. Input graphical spike location...
>SE
Processing... ...... .........
DSI: 0 PL: 0.
0 Errors. Confirm settlement? Y/N?...
>Y
Be advised, settlement occurring:
Location: Riverside, South-East of %LOADED_FIL%
Military Strength: NULL
Economy Rating: N/A
Materials: NULL
Food Supply: Fertile area NULL
Water Supply: Riverside NULL
Warning, UCIDs found on Map Graphical Interface:
0 - CRISPY TOWN
1 - BLOCK TOWN
2 - POLORAN
Be advised, established allegiance... 0-1... Continue Y/N?...
>Y
Input UCID Visual Name...
>&L&EET&Z&ERO
Registered UCID VN #3 as "LeetZero".
Input UCID Visual City Name...
>&L&IGACY
Registered UCID VCN #3 as "Ligacy".
Requesting spike supply mode:
a. Generated
b. Independent
>GENERATED
Spike supply mode received, establishing supply drop in T minus 30 minutes.
Generate regional highway system. Y/N?...
>N
Confirmed. Highways are not going to be connected automatically
EVA needs to turn offline to commence spike. Y/N?...
>Y
EVA shutting down...
All systems unloaded successfully.
Have a nice day, commander.
EVA_TERMINATED
>RUN bios.EVA.spike_simulation
Processing...
EVA Spike Simulation Systems online, requesting CUID
>3
CUID confirmed, supply spike in T minus 30 minutes, begin graphical simulation? Y/N
>Y
Graphical simulation confirmed, standby...
Simulation Map generated.
Estimated supply units:
POP: 29 units
STO: 2 units
IND: 1 unit
AGR: 8 unit
Registered Graphical simulation:

Input commands
>COMPLETE_SHUTDOWN
Shutdown? Y/N
>Y
System shutdown.
>SERVICES_UNLOAD
>SYSTEM_UNLOAD