yeah i need this for a new brick im working on. i tried calculating this by adjusting the height of the lip until i reached 25 degrees using the slope rise over run formula except i ended up with the result of the lip being 0.5 high, which wouldnt work haha.
i did make the 1x brick part 1.2 tall, so im right there.
yeah dont lecture me how milkshape sucks, i know.