So while i was gleefully farting around with the XV8 that I enslaved half of the clan to make I realized we only have 3 days until BW opens
Argos is going to be finished by the end of the day, wether or not I have to completely take over construction effort is unknown for now.
Torrent needs some work too. Grim, if you get the chance try to join while I'm hosting today.
Ares is pretty much done and ready to ship (haha pun)
XV8 and pulse weapons are done too, so in reality all we need to do is finish up Torrent and Argos. For now I'd like it if we focused our efforts on argos. There's not a lot left to do, and if everyone contributes it should be done in no time.
With the torrent iirc engine room, some parts of hull, and cannon room need work. Let's hold off on the advanced events until the construction is at least complete.