if that's how you want them to be
then that's that
not as much maintenance cost every year but still a lot of money to have built
they aren't going to be extremely structurally sound, just two warehouses built with lightweight and shielded materials to protect the supplies from radiation with one shelter equipped with an auxiliary generator.
anybody who has had sweden working with them on a space program at one point will be able to land there
sweden rejects the french offer since they'll be able to extract more economic value out of the Friesland in the long term (plus they don't even own the entire holland region, it would be a decent deal if france was paying more than one year's worth of GDP for both provinces, this means that it's a stuffty deal)