Author Topic: Earth 6.5- The Official "No nukes" version  (Read 174993 times)

Artemis Drones are cooler though
Seriously what's scarier to you a bunch of loving drills cutting open a hole in your giant hull and carrying with them a bunch of highly-trained soldiers or ERAUs
OR A loving TRIANGLE COMING IN AND SLICING THE THROATS OF EVERYBODY IN THE ROOM.
ERAUs have GMTP Engines and can be as small as a house cat.  They have MWR guns and Invincium blades.  And are available for purchase on the UHC market.

Erinaum works on trying to fire Telur through White Carbon fibers to create stronger GMPT Reactors and GnFTL Engines.
« Last Edit: November 21, 2012, 03:51:30 AM by SWAT One »

The space station launched today with a total of one million + passengers.  New Manhattan's flagship will begin construction.

EMS-7207 Lünåï begins assembly.  (Lünåï is a goddess from ancient Erinamese Mythology, said to be the mother of the Ancient Erins.  I am making a website that explains all of Erinaum that includes this explanation.)

Construction:   31%
Assembly:   4%
« Last Edit: November 24, 2012, 04:09:34 PM by SWAT One »

The EMS-7207 Lünåï is still being built.

Construction:   48%
Assembly:   24%

A process for mass-producing Telur is found, and more GEST Reactors are created to supply the energy for it.  The blueprints and infrastructure is now available for purchase on the UHCTU market.

New Manhattan's flagship is expected to launch next year.

We buy the plans, and test the nice stuff out.

Progress Report ODLX-001
Subject: EMS-7207 Lünåï

Construction:   32%
Assembly:   16%
Expected Completion Time (months):   40

Setbacks occur and the plans are rewritten.  In attempt to make the ship able to house more people and to be vastly more formidable.  A portal station is being built to ensure that materials can be received quicker.  Currently, the project's location is secret, and is hidden somewhere in the far reaches of the Lorem Galaxy.

Progress Report ODLX-059
Subject: EMS-7207 Lünåï

Construction:   68%
Assembly:   31%
Expected Completion Time (months):   28

With the new plans, the EMS-7207 Lünåï is 25% done.  The massive flagship is still unseen.  GnFTL engines like nothing else are being constructed.  A safe teleportation system is being engineered to allow the EMS-7207 Lünåï to teleport, even though it has GnFTL engines, which previously had been impossible.

New Manhattan's flagship is in orbit around Hera, and easily visible from the ground.  You know because it's loving massive.

Progress Report ODLX-067
Subject: EMS-7207 Lünåï

Construction:      73%
Assembly:      37%
Expected Completion Time (months):      16

With the new plans, the EMS-7207 Lünåï is 30% done.  The massive flagship has been spotted by space pirates, but their ship was quickly annihilated by an ETOD beam.  It is unlikely that they were able to send any coordinates.  Plans are completed for the teleportation system.  A matter-antimatter engine is being constructed for general space travel.  Using a new streamlined teleportation system, the ship's completion time has been reduced by more than a third.
« Last Edit: November 30, 2012, 02:11:37 AM by SWAT One »

Our flagship, currently is sending probes all around the globe, the moon, and the universe.

Progress Report ODLX-094
Subject: EMS-7207 Lünåï

Construction:   100%
Assembly:   73%
Expected Completion Time (months):   4

The new method allows for much faster transportation and the EMS-7207 Lünåï is 84% done.  Because of its mass, the flagship has a gravitational pull equal to Venus.

New Manhattan's flagship, NMS Degtyarev leaves Hera's orbit, and begins its trek toward the outside of the solar system.

Progress Report ODLX-094
Subject: EMS-7207 Lünåï

Construction:   100%
Assembly:   73%
Expected Completion Time (months):   4

The new method allows for much faster transportation and the EMS-7207 Lünåï is 84% done.  Because of its mass, the flagship has a gravitational pull equal to Venus.
That would cause trouble if it is near Hera...

That would cause trouble if it is near Hera...
The anti-gravity generators aren't online yet.



Progress Report ODLX-118
Subject: EMS-7207 Lünåï

Construction:   100%
Assembly:   92%
Expected Completion Time (months):   1

The EMS-7207 Lünåï is 98% done.  The testing phase is approaching quickly.